Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Stage 2 Criteria (from the PLD)

Meets / Needs Improvement / Missing / Not Applicable

Supporting Data (if needed, include links to specific examples)

Development of a growth plan (to include both roadmap of projected feature sets as well as overall community growth/project maturity), to be done in conjunction with their project mentor(s) at the TAC.

 Meets

Within Akraino, there is currently


Document that it is being used in POCs.

 Meets

Each Blueprint (Integration) project is required to submit the followng set of  Documents:

  1. Architecure Description, 2. API description, 3. Test Description, 4. Installation Guide, 5. Test description. The deployment status of the Blueprint, bening, being PoC, Demo , or Commercial is presented/indicated in the Architecure Blueprint Architecture Document.

Demonstrate a substantial ongoing flow of commits and merged contributions.

 Meets

There had been 623 committs, by 62 contributors over 36 repositories.

https://lfanalytics.io/projects/lfedge%2Fedgex-foundry/dashboard

Demonstrate that the current level of community participation is sufficient to meet the goals outlined in the growth plan.

 Meets

https://lfanalytics.io/projects/lfedge%2Fedgex-foundry/dashboard

Demonstrate evidence of, or a plan for, interoperability, compatibility or extension to other LF Edge Projects. Examples may include demonstrating modularity (ability to swap in components between projects).

 Meets

https://wiki.edgexfoundry.org/display/FA/Open+Horizon+-+EdgeX+Project+Group

...